2007
Year
VIKING
Builder
64' 1" (19.53m)
Length
4
Cabins

Critical Path - 2007 64' 1" VIKING
Fort Lauderdale Florida United States
$1,599,000 USD


Yacht for sale is a 2007 VIKING 64' 1" "Critical Path" Sport Fisherman in Fort Lauderdale, Florida, USA.

Critical Path - 64 Viking 2007 is new to market! Viking is in great condition and has full time captain with open check book policy. There have been many upgrades over the past 5 years. Located in Fort Lauderdale and easy to view.


Get more information on this listing
LENGTH 64' 1"
BUILDER VIKING
ASKING PRICE $1,599,000 USD
BUILT 2007
BEAM 19' 3"
DRAFT N/A
MAX SPEED 40 Knots
CRUISING SPEED 28 Knots
CABINS 4
GROSS TONNAGE 0.00
DISPLACEMENT N/A
LOCATION Fort Lauderdale, Florida, USA
Get more information on this listing

FULL SPECIFICATIONS

Additional Information

Critical Path - 64 Viking 2007 is new to market! Viking is in great condition and has full time captain with open check book policy. There have been many upgrades over the past 5 years. Located in Fort Lauderdale and easy to view.

Recent Updates

(2024) New eskimo ice chipper, cockpit freezer, bridge freezer, & bridge fridge

(2024) Starlink

(2024) Insulated all fridge/freezer boxes.

(2023) SeaKeeper sphere replaced under warranty.

(2023) Custom livewell lid

(2023) Aftercooler replacement

(2023) Electronics & exterior audio replacement

(2022)New interior runner

(2022) New turbo chargers

(2022) New windlass

(2021) Exhaust risers rebuilt.

(2021)Major generator service

(2021) Mezzanine cushions replaced.

(2020) Bow thruster rebuilt.

(2019) new countertops, carpet, some TVs, and bedding

 

 

Vessel Walkthrough

Boarding the cockpit of the 64' Viking 2007 “Critical Path” you immediately notice the big cockpit, with the 19’2” beam it provides a 180 square foot cockpit complete with mezzanine seating. Cockpit highlights include:

  • Mezzanine seating. Cushions replaced (2021)
  • Teak Cockpit (2018) & Mezzanine Flooring
  • Teak Fighting Chair
  • Teak Rocket Launcher
  • SunShade
  • In-Deck Fish Box with Split Lid
  • In-Deck Fish Box/ Ice Maker
  • Refrigerated Step Box
  • New cockpit freezer
  • Under Mezzanine Seating Bait Freezers 
  • Fresh/Saltwater washdown
  • Storage Under Port/Starboard Coamings
  • (2) 24 Volt Receptacles in Under Coaming Storage
  • JL Audio Speakers and fusion control (2023)

You enter the salon through the electronically powered door.  Critical Path has a traditional convertible layout, which features the salon, galley and dinette all on one level. This space is very social and inviting as an interior gathering space for family and friends after a day out on the water. The high gloss teak finish is in good condition.

To port is a large L shaped sofa with storage beneath. To starboard is storage cabinets and pop up TV with Garmin capabilities. Just forward on starboard side is the dinette with a high gloss teak table.  The dinette also has a flat screen TV with Garmin capabilities.  Across to port is the fully equipped galley.  The galley countertops have two bar stools on the salon side.  The galley features everything you need while away from the dock:

  • (6) under counter Sub Zero drawers 4 fridge, 2 freezer
  • New Countertops (2019)
  • New carpet (2019)
  • New Carpet Runner (2022)
  • Ice Maker
  • Electric cook top
  • Microwave convection oven
  • Deep SS sink with disposal
  • Exceptional storage

The centerline stairwell separating the galley and dinette leads down to the lower accommodations.  The layout below features a four stateroom three head arrangement.

At the base of the stairs to the aft and starboard is the entrance to the first guest staterooms.  This room features Criss-cross bunks 

Just forward and to the port is the master stateroom with a private ensuite head. Back out to the companionway and across the hall is bunk bed room to starboard and laundry facilities to port.  All the way forward is the VIP stateroom with ensuite head.

Guest Stateroom 1

  • Criss cross bunks
  • Nightstand in between
  • TV
  • Reading lights
  • Climate controls
  • Cedar lined hanging locker

Guest stateroom 2

  • Bunk beds
  • Hanging locker
  • Climate controls

VIP stateroom

  • Island queen berth
  • TV
  • Storage beneath bed
  • Twin hanging lockers
  • Hatch for overhead light
  • Climate controls
  • Ensuite Head

Master Stateroom

  • Island king berth
  • large hanging closet
  • Ensuite head
  • TV
  • Climate controls

Back out to the cockpit and up the ladder on the starboard side forward leads us to the flybridge. The bridge is large with ample seating.  There is an L-shaped lounge forward of the helm station and a bench seat that runs fore and aft on the starboard side. "Critical Path" has a teak helm pod with single lever Palm Beach controls with bow thruster buttons built in.  For safety purposes there is a fiberglass hatch cover that drops to cover the open ladder well.  Forward of the helm features a HUGE deep freezer and a refrigerated drink box (2024). The electronics were replaced in 2023.

  • Release Marine Teak Helm Chairs
  • Release Marine Teak Helm Pod
  • Single Lever Controls With Bow Thruster Controls
  • Electronic Trolling Valves
  • (4) Garmin GPSMAP Touch Screens (2023)
  • Fusion Apollo Head unit (2023)
  • (2) ICOM VHF Radios
  • Seakeeper Control Panel
  • Side Power Bow Thruster
  • Simrad AP26 Autopilot 
  • ACR Spotlight
  • MiyaEnoch US-9 teaser reels
  • New Bridge/Console Bait Freezer (2023)
  • New bridge refrigerator (2023) 

Tower

  • Garmin GPSMAP Touch Screen 
  • Garmin Tri Data
  • Controls
  • VHF
Engine/Mechanical Equipment
  • Twin CAT C32A w/ 3430 hours SMOH
  • Twin Onan generators w/ 4355/4473 hours
  • Water Maker
  • LED Lights
  • Exhaust risers rebuilt (2021)
  • Major Generator Service (2021)
  • New Turbo Cartridges (2022)
  • Aftercooler replacement (2023)

 

Interested in this boat?

Thank you for considering this exceptional yacht. To receive further details or arrange a personalized consultation, please complete the form below. Our yacht specialists will be in touch to provide all the details you need to make an informed decision. Your journey to owning the perfect yacht begins here.

Share With Your Friends

VIKING 2007